High-density fed-batch
Three Rushton impellers, ring and micro-spargers and O₂ enrichment support oxygen demand at 150 g/L DCW and above.
Production scale · Yeast fermentation
A fully automated production bioreactor for high-cell-density fed-batch and continuous Pichia pastoris processes. Vessel, skid, instruments, PLC/SCADA and safety systems come as one integrated package for cGMP plants. The design targets high heat removal and high oxygen transfer at production scale.

Pichia pastoris runs push oxygen transfer, heat removal and feed control to their limits. This system is sized for that load, with extra headspace for foam, redundant sensing and a methanol feed loop that keeps residual methanol close to setpoint as cell density climbs.
Three Rushton impellers, ring and micro-spargers and O₂ enrichment support oxygen demand at 150 g/L DCW and above.
An exponential base feed with off-gas feedback, a Coriolis meter and automatic pump failover. Feed stops if methanol builds up.
Stamped ASME BPE design reports, 3.1 material certificates, FAT/SAT protocols and IQ/OQ templates ship with the system.
Vessel & mechanical design
A deliberately over-specified mechanical envelope gives the process room to manage foam, heat, gas transfer and cell density without compromise.
Working volume 5000 L ±10%. Design pressure 3 bar(g) at 150 °C. Design range −10 °C to +150 °C.
316L stainless steel with electropolished internal surface. FDA / EC1935 silicone or EPDM gaskets. External #4 brushed finish.
Three Rushton impellers, maximum tip speed 7 m/s. Magnetic drive with double mechanical seal and steam barrier.
Laser-drilled ring sparger plus micro-sparger for oxygen enrichment. All connections are ASME BPE tri-clamp.
Instrumentation
Redundant pH and DO probes, dual Pt100 sensors and load cells give the control system a second opinion on every value that can end a batch.
04 · Methanol feed automation
The PLC sets a base exponential feed from the chosen growth rate, then trims it with live methanol readings from the off-gas analyser. If the analyser drops out, the loop falls back to a pre-validated feed curve and raises an alarm.
01 · Measure
Siemens Maxum Edition II. Methanol range 0–1000 ppmv, sample every 10 min, OPC UA push to PLC.
02 · Decide
F(t) = F0·e^(μt) + PID trim
μ 0.12–0.18 h−1, user-set. Methanol setpoint e.g. 0.2 g/L.
03 · Deliver
Watson-Marlow, 0.5–50 L/day, pulsation under ±1%. Auto-switch to backup pump on occlusion.
04 · Verify
Endress+Hauser Promass F300, ±0.1% of reading, HART 7 with density compensation.
Automatic shutdown if methanol exceeds 1 g/L, or if DO stays below 5% for more than 5 minutes.
On GC failure, alarm 501 fires within 30 s and the feed returns to the base curve within ±1%.
Control logic is SHA-256 hashed after QA approval. Every feed-rate change is logged with user ID and timestamp.
| Condition | Response | Alarm |
|---|---|---|
| GC data stale > 15 min | Switch to pre-validated exponential feed curve | 501 |
| DO below 10% saturation | Reduce feed rate by 50% immediately | 511 |
| Flow deviation > ±2% of setpoint for 10 min | Stop feed and hold for operator intervention | 522 |
| Torque > 1.5 N·m for 2 s | Auto-switch to the backup pump | 530 |
Sterilization & cleaning
Automated CIP holds 121.0 to 121.5 °C across every port for F0 of at least 45 minutes. CIP delivers verified spray coverage and a WFI-quality rinse before the next batch.
At all points, including the drain valve dead-leg cold spot
Pt100 RTDs, ±0.1 °C, mapped across vessel, ports and steam lines
Consecutive runs, time-to-121 °C σ ≤ 2%, F0 spread ≤ 5%
B. stearothermophilus indicators, with steam quality to EN 285
3× static spray balls in 316L SS with 360° coverage, verified by ATP swabs at RLU ≤ 50 after CIP.
Conductivity and TOC monitoring (0–200 µS/cm) with a final WFI rinse.
Bottom drain with steam block valve and no dead legs, L/D ≤ 2:1 at every port.
| Interlock | Condition | Action |
|---|---|---|
| Steam valve position | Open while vessel pressure > 3.5 bar(g) | Hard stop, valve closes |
| Condensate drain | Temperature > 95 °C at drain outlet | Alarm 620, check steam trap |
| Cooling N₂ overlay | Vessel pressure < 0.2 bar(g) during cooling | Automatic N₂ injection |
| Heat-up timeout | Average temperature < 115 °C after 60 min | Alarm 601, sequence aborts |
Automation & software
Hot-swap PLCs, a virtualized SCADA historian and a network segmented to IEC 62443, built so no single failure interrupts a run in progress.
OPC UA / HTTPS
MQTT · TLS 1.3
Profinet IRT
Utility requirements & safety
The utility schedule is visible for early engineering review, so the vessel is treated as a complete process node. Compliance is expressed in hardware, interlocks and certificates.
Utility / tie-in
1000 kg/h3 bar(g), dryness ≥ 0.95
Utility / tie-in
500 L/min3 bar(g), 316L pump
Utility / tie-in
25 m³/h4 °C, ΔT 5 °C, glycol option
Utility / tie-in
Class 0Oil-free, ISO 8573-1, −40 °C dew point
Acceptance criteria
The three gates the system must pass before it is considered accepted.

STAGE 01
Every control function, alarm and SIP/CIP cycle is verified before shipment. The methanol loop runs a 72-hour simulated fermentation with step changes and fault injection.

STAGE 02
Water runs confirm kLa of at least 300 h−1. SIP thermal mapping uses 12 thermocouples and biological indicators across three consecutive cycles.

STAGE 03
Handover follows three consecutive successful fermentation runs at 150 g/L DCW or higher and operator training.
Process control & validation specification
Adaptive PID with gain scheduling on dissolved oxygen, an exponential base feed and GC-driven feedback.
Sample values shown for illustration.
Active methanol (M)
0.216g/L, optimalLoop gain (Kp)
0.842scheduledSystem health
99.8%zero faultsCurrent growth rate
0.152h⁻¹, stableF(t) = F₀·e^(μ·t) + Kp·(M_setpoint − M_actual) + Ki·∫₀ᵗ (M_setpoint − M_actual) dτ
| Symbol | Description | Range / unit |
|---|---|---|
| F(t) | Methanol feed rate | 0.5–50 L/h |
| F₀ | Base feed rate at t = 0 | L/h, user-set |
| μ | Specific growth rate | 0.12–0.18 h⁻¹ |
| M_setpoint | Methanol setpoint | 0.2 g/L typical |
| M_actual | Measured methanol from GC | g/L |
| Kp, Ki | PID gains, gain scheduled | Kp = 0.8·(1 + 0.05·(DO − 30%)) |
// ADAPTIVE PID BLOCK WITH GAIN SCHEDULING (IEC 61131-3 ST)
IF GC_Data_Valid THEN
PID.MV := FeedRate_Base * EXP(GrowthRate * T#24h);
PID.SP := Methanol_Setpoint; // e.g. 0.2 g/L
PID.PV := GC_Methanol_Value;
// Gain scheduling based on dissolved oxygen
PID.Kp := 0.8 * (1 + 0.05 * (DO_Actual - 30));
PID.Ki := 0.02; // Integral time = 50 s
PID.Kd := 0.0; // Derivative disabled for
stability
Actual_Feed_Rate := LIMIT(PID.MV, 0.5, 50.0);
ELSE
Activate_Fallback_Feed(); // Pre-validated exponential
curve
ALARM 501: "GC OFFLINE - MODEL-BASED FEED ACTIVE";
END_IF;
// Anti-windup protection
IF Actual_Feed_Rate >= 50.0 OR Actual_Feed_Rate <= 0.5 THEN
PID.Integral := PID.Integral; // Freeze integrator
END_IF;// REAL-TIME METHANOL FEED ADJUSTMENT (IEC 61131-3 ST)
F_BASE := F0 * EXP(mu * T#24h); // Base exponential feed
GC_VALID := (GC.Status = OK) AND (GC.Timestamp > NOW - T#15m);
IF GC_VALID THEN
ERROR := GC.Methanol - SP_Methanol;
INTEGRAL := INTEGRAL + (ERROR * dT);
DERIVATIVE := (ERROR - PREV_ERROR) / dT;
F_ADJ := Kp*ERROR + Ki*INTEGRAL + Kd*DERIVATIVE;
OUTPUT_RATE := LIMIT(F_BASE + F_ADJ, 0, F_MAX);
ELSE
OUTPUT_RATE := F_BASE; // Fallback mode
ALARM 501: "GC OFFLINE - MODEL-BASED FEED ACTIVE";
END_IF;
// Anti-windup: clamp INTEGRAL when OUTPUT_RATE is at its limits// SIP AUTOMATED SEQUENCE (Siemens SFC)
PHASE 1: PREPURGE
Open vent_valve := TRUE;
Open condensate_valve := TRUE;
N2_purge_flow := 5 L/min;
Duration := 5 min;
// Interlock: N2 flow verified by mass flow meter
PHASE 2: HEATING
Steam_pressure_SP := 2.5 bar(g);
Pressure_ramp := 0.5 bar/min MAX;
IF (AVG_temp < 115 C) AND (phase_time > 60 min) THEN
TRIGGER ALARM 601: "HEAT-UP TIMEOUT";
ABORT_SEQUENCE();
END_IF;
PHASE 3: STERILIZATION
Temp_SP := 121.0-121.5 C;
Dwell_time := 30 min;
IF ANY(TEMP[1..12] < 120.5) THEN
RESTART_DWELL_TIMER();
END_IF;
PHASE 4: COOLING
Steam_valve := CLOSE;
N2_overlay_pressure := 0.8 bar;
Cooling_rate := 0.5 C/min;
Target_temp := 80 C;
// Interlock: vessel pressure monitored during cooling// REAL-TIME METHANOL FEED ADJUSTMENT (IEC 61131-3 ST)
F_BASE := F0 * EXP(μ * T#24h); // Base exponential feed
GC_VALID := (GC.Status = OK) AND (GC.Timestamp > NOW - T#15m
IF GC_VALID THEN
ERROR := GC.Methanol - SP_Methanol;
INTEGRAL := INTEGRAL + (ERROR * dT);
DERIVATIVE := (ERROR - PREV_ERROR) / dT;
F_ADJ := Kp*ERROR + Ki*INTEGRAL + Kd*DERIVATIVE;
OUTPUT_RATE := LIMIT(F_BASE + F_ADJ, 0, F_MAX);
ELSE
OUTPUT_RATE := F_BASE; // Fallback mode
ALARM 501: "GC OFFLINE - MODEL-BASED FEED ACTIVE";
END_IF
// Anti-windup: Clamp INTEGRAL when OUTPUT_RATE at limitsFour review gates, one coordinated package. Keep engineering, validation and operations looking at the same answer.
Back to Top| SYMBOL | DESCRIPTION | RANGE / UNIT |
|---|---|---|
| F(t) | Methanol feed rate | 0.5–50 L/h |
| F₀ | Base feed rate at t=0 | L/h (user-set) |
| μ | Specific growth rate | 0.12–0.18 h⁻¹ |
| M_setpoint | Methanol setpoint | 0.2 g/L (typical) |
| M_actual | Measured methanol from GC | g/L |
| Kp, Ki | PID gains (gain-scheduled) | Kp = 0.8·(1+0.05·(DO−30%)) |
// ADAPTIVE PID BLOCK WITH GAIN SCHEDULING
IF GC_Data_Valid THEN
PID.MV := FeedRate_Base * EXP(GrowthRate * T#24h);
PID.SP := Methanol_Setpoint; // e.g., 0.2 g/L
PID.PV := GC_Methanol_Value;
// Gain scheduling based on dissolved oxygen
PID.Kp := 0.8 * (1 + 0.05 * (DO_Actual - 30));
PID.Ki := 0.02; // Integral time = 50s
PID.Kd := 0.0; // Derivative disabled for stability
Actual_Feed_Rate := LIMIT(PID.MV, 0.5, 50.0);
ELSE
Activate_Fallback_Feed(); // Pre-validated exponential curve
ALARM 501: "GC OFFLINE - MODEL-BASED FEED ACTIVE";
END_IF;
// Anti-windup protection
IF Actual_Feed_Rate >= 50.0 OR Actual_Feed_Rate <= 0.5 THEN
PID.Integral := PID.Integral; // Freeze integrator
END_IF;Cybersecurity, data integrity & reproducibility
Network segmentation to IEC 62443, recipe lockdown with SHA-256, a tamper-evident audit trail, and the statistical thresholds three validation runs must meet.
| Item | Requirement |
|---|---|
| Recipe lockdown | SHA-256 hashing of control logic after QA approval |
| Access tiers | Operator, Engineer and Admin roles; biometric admin login, FAR ≤ 0.001%. Permissions per tier to be confirmed by QA |
| Audit trail | XML logs: user ID and timestamp for every feed-rate change, plus a checksum of the algorithm code before and after any change |
| Code signing | PLC logic signed with ECDSA-384 |
| Segmentation | IEC 62443 zone and conduit model, VLANs and firewall |
| Area | Requirement |
|---|---|
Reproducibility | σ of time to 121 °C ≤ 2%; (Max F₀ − Min F₀) / Avg F₀ ≤ 5% |
Steam quality (EN 285:2015) | Non-condensable gases ≤ 3.5% v/v; dryness ≥ 0.95; superheat ≤ 25 °C above saturation |
Thermocouples | 12× T-type, Omega TJ36-CAXL-116U, ±0.5 °C |
Biological indicators | B. stearothermophilus, ≥ 10⁶ spores per vial, at 3 locations |
Data sampling | 1 Hz continuous, synchronized across all channels |
SIP cycle reproducibility
Validation-grade thermal specifications for steam sterilization of the fermentation vessel and the feed skid.
| Parameter | Requirement | Measurement method |
|---|---|---|
| Heat-up rate | 1.0 ± 0.2 °C/min | 12× RTDs (Pt100, ±0.1 °C) |
| Dwell temperature | 121.0 to 121.5 °C at all probes | Data logger, 1 Hz sampling |
| F₀ | ≥ 45 min, equivalent lethality at 121.1 °C | Integrated from the logged profile |
| Cold spot | ≥ 121 °C in the drain valve dead-leg (TC #12) | Wireless datalogger (Ellab TrackSense) |
F₀ = ∫₀ᵗ 10^((T(τ) − 121.1) / 10) dτ
Integrated per probe across the full cycle, with acceptance at F₀ ≥ 45 min at every mapped point (PDA TR01).
Vendor testing & deliverables
Factory and site acceptance protocols, referenced by test case number so QA can match each result to its clause.
| Test case | Method | Acceptance |
|---|---|---|
TC-107 step response | OUR step change 50 → 150 mmol/L/h | Settling ≤ 15 min, overshoot ≤ 5% |
TC-108 fault recovery | Simulated GC failure at t = 12 h | Fallback within 30 s; methanol drift ≤ 0.05 g/L over 4 h |
TC-109 accuracy | Calibrated load cell vs flow meter, 72 h continuous | Cumulative error ≤ 0.5% over 72 h |
Automation FAT | OPC UA test with historian, 500 tags at 1 Hz | All tags logged; fault injection handled |
Methanol feed FAT | 72 h simulated fermentation, OUR 10 → 150 mmol/L/h | Feed deviation ≤ ±2% of setpoint |
| Test case | Method | Acceptance |
|---|---|---|
TC-213 thermal mapping | 12 thermocouples + 3 biological indicators | All BIs negative; F₀ ≥ 45 min at all probes |
TC-215 worst-case drain | 5000 L water + thermowell blocks at drain points | Drain TC ≥ 121 °C for the full 30 min dwell |
TC-218 condensate TOC | Post-SIP drain sampling, HPLC analysis | TOC ≤ 500 ppb |
Utility SAT, SIP | All validation ports | 121 °C ±1 °C for 30 min |
Utility SAT, CIP | Spray device velocity check | ≥ 5 m/s per ASME BPE |
Site planning
Engineering detail
Component models, control settings, calibration intervals and test protocols for engineering and QA teams reviewing the system against their URS.
Documentation & deliverables
One source of truth. Four evidence buckets.
A production asset is only procurement-ready when drawings, certificates, validation templates and manuals are as traceable as the steel. Four review gates, one coordinated package, so engineering, validation and operations all look at the same answer.
Documentation package
KNIK workshop
Share your URS or project brief. Our engineers review it and reply within 24 hours.
HQ: No.48 Liuxiang Road, Jiading District, Shanghai, China